Which one from the below options is correct logic sequence in case of Planning Strategy settings

Requirement Type - Strategy Group - Main Strategy - Material Master
Material Master - Main Strategy - Strategy Group - Requirement Type
Main Strategy - Strategy Group - Requirement Type - Material Master
Material Master - Strategy Group - Main Strategy - Requirement Type
Verified Answer
Correct Option - d

To get all Infosys Certified SAP S4 HANA Logistics Manufacturing Professional Consultant Exam questions Join Telegram Group https://rebrand.ly/lex-telegram-236dee

Telegram